Shack Project from 2003

Shack Project in 2003

Earth Rod to Copper Pipe Earth System

The Work Began 5 Days from start to finish big thanks all my very good friends who help with this project. We started with the RF earth system 12ft copper Earth rod driven in the ground under the house,
The water table is very high here and the house was built on mash land which was Salt water and RF grounding is very good but we had to drill into 4feet of concrete to get to soil but we made it.
This system connect to the earth system outside in the Garden.

Then the rest of the shack was built around this as the pictures show.

Nick G0SDI doing his soldering bit boy you should him solder PL 259’s with that blow lamp. this is no pl 259
Blowing smoke Top of the RF earth System using 28mm Copper pipe wider the better. P.S note the blowing smoke and no 5KW amp in line hi hi..
Woodwork going in for radio’s etc.. going up. woodwork
Trunking Room all a mess but showing white Trunking for RF coax routes on the back wall, also framing for under cupboard.
pine worktop going on. Pine Work Top
Taking Shape starting to take shape.
Nearly forgot to put the Trunking on the back wall for radio power cables etc.. trunking
Pine in Place Well all the pine work was done
Watch your Fingers Watch them Fingers
Smile Your on Camera Well we thought it was funny as he did hit his fingers, Chris and Martin the Joiners

WELL ALL THE HARD WORK WAS DONE. NOW AND IT WAS UP TO ME TO DECORATE AND FRENCH POLISH
ALL THE PINE AND I ENDED UP WITH A NEW SHACK LIKE THIS.
!
2
3
4
My First FT-1000MP Under
My Server Lots of Horse Power in this Little Baby Drivers Seat
The Driving Seat FT-1000MP MKV LINE UP
THE FT-1000MKV LINE UP ALSO THE SP-8 SPEAKER WITH THE BHI DSP FITTED